Version: 0.9 (using KDE 3.1.3) Installed from: Mandrake Linux Cooker i586 - Cooker Compiler: gcc version 3.3.1 (Mandrake Linux 9.2 3.3.1-2mdk) OS: Linux (i686) release 2.4.22-10mdk System ----------------------- K3b Version: 0.9 KDE Version: 3.1.3 QT Version: 3.1.2 cdrecord ----------------------- scsidev: '1,0,0' scsibus: 1 target: 0 lun: 0 Linux sg driver version: 3.1.25 SCSI buffer size: 64512 Cdrecord-Clone 2.01a18-dvd (i686-pc-linux-gnu) Copyright (C) 1995-2003 Jörg Schilling Note: This version is an unofficial (modified) version with DVD support Note: and therefore may have bugs that are not present in the original. Note: Please send bug reports or support requests to <warly@mandrakesoft.com>. Note: The author of cdrecord is not to be bothered with problems in this version. TOC Type: 1 = CD-ROM Using libscg version 'schily-0.7' Driveropts: 'burnfree' atapi: 1 Device type : Removable CD-ROM Version : 0 Response Format: 2 Capabilities : Vendor_info : 'HL-DT-ST' Identifikation : 'DVDRAM GSA-4082B' Revision : 'A201' Device seems to be: Generic mmc2 DVD-R/DVD-RW. Current: 0x0009 Profile: 0x0012 Profile: 0x0011 Profile: 0x0014 Profile: 0x0013 Profile: 0x001A Profile: 0x001B Profile: 0x0010 Profile: 0x0009 (current) Profile: 0x000A Profile: 0x0008 Profile: 0x0002 Using generic SCSI-3/mmc CD-R/CD-RW driver (mmc_cdr). Driver flags : MMC-3 SWABAUDIO BURNFREE Supported modes: TAO PACKET SAO SAO/R96P SAO/R96R RAW/R16 RAW/R96P RAW/R96R Drive buf size : 1204224 = 1176 KB FIFO size : 4194304 = 4096 KB /usr/bin/cdrecord: Operation not permitted. WARNING: Cannot set RR-scheduler /usr/bin/cdrecord: Permission denied. WARNING: Cannot set priority using setpriority(). /usr/bin/cdrecord: WARNING: This causes a high risk for buffer underruns. Track 01: data 523 MB Total size: 601 MB (59:33.13) = 267985 sectors Lout start: 601 MB (59:35/10) = 267985 sectors Current Secsize: 2048 ATIP info from disk: Indicated writing power: 4 Is not unrestricted Is not erasable Disk sub type: Medium Type A, high Beta category (A+) (3) ATIP start of lead in: -11077 (97:34/23) ATIP start of lead out: 359848 (79:59/73) Disk type: Long strategy type (Cyanine, AZO or similar) Manuf. index: 11 Manufacturer: Mitsubishi Chemical Corporation Blocks total: 359848 Blocks current: 359848 Blocks remaining: 91863 Starting to write CD/DVD at speed 24 in dummy SAO mode for single session. Last chance to quit, starting dummy write in 2 seconds. 1 seconds. 0 seconds. Operation starts. Waiting for reader process to fill input buffer ... input buffer ready. trackno=0 BURN-Free is ON. Sending CUE sheet... /usr/bin/cdrecord: WARNING: Drive returns wrong startsec (0) using -150 Writing pregap for track 1 at -150 Starting new track at sector: 0 Track 01: 0 of 523 MB written. Track 01: 1 of 523 MB written (fifo 100%) [buf 100%] 13.3x. Track 01: 2 of 523 MB written (fifo 100%) [buf 99%] 12.3x. Track 01: 3 of 523 MB written (fifo 100%) [buf 99%] 12.8x. Track 01: 4 of 523 MB written (fifo 100%) [buf 100%] 12.4x. Track 01: 5 of 523 MB written (fifo 100%) [buf 99%] 12.6x. Track 01: 6 of 523 MB written (fifo 100%) [buf 99%] 12.4x. /usr/bin/cdrecord: Input/output error. write_g1: scsi sendcmd: no error CDB: 2A 00 00 00 0C 5A 00 00 1F 00 status: 0x2 (CHECK CONDITION) Sense Bytes: 70 00 04 00 00 00 00 10 8B 5F 93 80 08 03 00 00 Sense Key: 0x4 Hardware Error, Segment 0 Sense Code: 0x08 Qual 0x03 (logical unit communication crc error (ultra-dma/32)) Fru 0x0 Sense flags: Blk 0 (not valid) cmd finished after 0.040s timeout 200s /usr/bin/cdrecord: A write error occured. /usr/bin/cdrecord: Please properly read the error message above. write track data: error after 6475776 bytes Writing time: 25.940s Average write speed 138.0x. Min drive buffer fill was 99% Fixating... WARNING: Some drives don't like fixation in dummy mode. Fixating time: 8.208s /usr/bin/cdrecord: fifo had 166 puts and 103 gets. /usr/bin/cdrecord: fifo was 0 times empty and 93 times full, min fill was 93%. cdrecord comand: ----------------------- /usr/bin/cdrecord -v gracetime=2 dev=1,0,0 speed=24 -dao -dummy driveropts=burnfree -eject -overburn -data /mnt/data1/iso/formation110504.iso mkisofs ----------------------- Warning: creating filesystem that does not conform to ISO-9660. Using interconnexi000.fonctions.noy.g for inetdoc/interconnexion.fonctions.noyau.ps.gz (interconnexion.fonctions.noyau-a4r.ps.gz) Using interconnex000.fonctions.no.pdf for inetdoc/interconnexion.fonctions.noyau.pdf (interconnexion.fonctions.noyau-a4r.pdf) 1.12% done, estimate finish Tue May 11 20:10:23 2004 1.31% done, estimate finish Tue May 11 20:10:23 2004 1.49% done, estimate finish Tue May 11 20:11:29 2004 1.68% done, estimate finish Tue May 11 20:11:22 2004 1.87% done, estimate finish Tue May 11 20:11:16 2004 2.05% done, estimate finish Tue May 11 20:11:11 2004 2.24% done, estimate finish Tue May 11 20:11:07 2004 2.43% done, estimate finish Tue May 11 20:11:04 2004 2.61% done, estimate finish Tue May 11 20:11:01 2004 2.80% done, estimate finish Tue May 11 20:10:58 2004 2.99% done, estimate finish Tue May 11 20:10:56 2004 3.18% done, estimate finish Tue May 11 20:10:54 2004 3.36% done, estimate finish Tue May 11 20:11:22 2004 3.55% done, estimate finish Tue May 11 20:11:19 2004 3.74% done, estimate finish Tue May 11 20:11:16 2004 3.92% done, estimate finish Tue May 11 20:11:14 2004 4.10% done, estimate finish Tue May 11 20:11:11 2004 4.29% done, estimate finish Tue May 11 20:11:09 2004 4.48% done, estimate finish Tue May 11 20:11:07 2004 4.66% done, estimate finish Tue May 11 20:11:05 2004 4.85% done, estimate finish Tue May 11 20:11:24 2004 5.04% done, estimate finish Tue May 11 20:11:22 2004 5.23% done, estimate finish Tue May 11 20:11:20 2004 5.42% done, estimate finish Tue May 11 20:11:18 2004 5.60% done, estimate finish Tue May 11 20:11:16 2004 5.79% done, estimate finish Tue May 11 20:11:14 2004 5.97% done, estimate finish Tue May 11 20:11:13 2004 6.16% done, estimate finish Tue May 11 20:11:11 2004 6.34% done, estimate finish Tue May 11 20:11:26 2004 6.53% done, estimate finish Tue May 11 20:11:24 2004 6.72% done, estimate finish Tue May 11 20:11:22 2004 6.90% done, estimate finish Tue May 11 20:11:35 2004 7.09% done, estimate finish Tue May 11 20:11:33 2004 7.28% done, estimate finish Tue May 11 20:11:31 2004 7.46% done, estimate finish Tue May 11 20:11:29 2004 7.65% done, estimate finish Tue May 11 20:11:28 2004 7.84% done, estimate finish Tue May 11 20:11:26 2004 8.03% done, estimate finish Tue May 11 20:11:37 2004 8.21% done, estimate finish Tue May 11 20:11:36 2004 8.40% done, estimate finish Tue May 11 20:11:34 2004 8.58% done, estimate finish Tue May 11 20:11:32 2004 8.77% done, estimate finish Tue May 11 20:11:31 2004 8.96% done, estimate finish Tue May 11 20:11:29 2004 9.14% done, estimate finish Tue May 11 20:11:28 2004 9.33% done, estimate finish Tue May 11 20:11:27 2004 9.52% done, estimate finish Tue May 11 20:11:26 2004 9.70% done, estimate finish Tue May 11 20:11:35 2004 9.89% done, estimate finish Tue May 11 20:11:33 2004 10.08% done, estimate finish Tue May 11 20:11:32 2004 10.26% done, estimate finish Tue May 11 20:11:31 2004 10.45% done, estimate finish Tue May 11 20:11:29 2004 10.64% done, estimate finish Tue May 11 20:11:28 2004 10.83% done, estimate finish Tue May 11 20:11:27 2004 11.01% done, estimate finish Tue May 11 20:11:26 2004 11.20% done, estimate finish Tue May 11 20:11:25 2004 11.39% done, estimate finish Tue May 11 20:11:33 2004 11.57% done, estimate finish Tue May 11 20:11:32 2004 11.76% done, estimate finish Tue May 11 20:11:31 2004 11.94% done, estimate finish Tue May 11 20:11:29 2004 12.13% done, estimate finish Tue May 11 20:11:28 2004 12.32% done, estimate finish Tue May 11 20:11:27 2004 12.50% done, estimate finish Tue May 11 20:11:26 2004 12.69% done, estimate finish Tue May 11 20:11:26 2004 12.88% done, estimate finish Tue May 11 20:11:25 2004 13.06% done, estimate finish Tue May 11 20:11:31 2004 13.25% done, estimate finish Tue May 11 20:11:30 2004 13.43% done, estimate finish Tue May 11 20:11:29 2004 13.63% done, estimate finish Tue May 11 20:11:29 2004 13.81% done, estimate finish Tue May 11 20:11:35 2004 14.00% done, estimate finish Tue May 11 20:11:34 2004 14.18% done, estimate finish Tue May 11 20:11:33 2004 14.37% done, estimate finish Tue May 11 20:11:32 2004 14.56% done, estimate finish Tue May 11 20:11:31 2004 14.74% done, estimate finish Tue May 11 20:11:30 2004 14.93% done, estimate finish Tue May 11 20:11:29 2004 15.12% done, estimate finish Tue May 11 20:11:35 2004 15.30% done, estimate finish Tue May 11 20:11:34 2004 15.49% done, estimate finish Tue May 11 20:11:34 2004 15.68% done, estimate finish Tue May 11 20:11:33 2004 15.86% done, estimate finish Tue May 11 20:11:32 2004 16.05% done, estimate finish Tue May 11 20:11:31 2004 16.23% done, estimate finish Tue May 11 20:11:30 2004 16.42% done, estimate finish Tue May 11 20:11:29 2004 16.61% done, estimate finish Tue May 11 20:11:29 2004 16.80% done, estimate finish Tue May 11 20:11:28 2004 16.98% done, estimate finish Tue May 11 20:11:33 2004 17.17% done, estimate finish Tue May 11 20:11:32 2004 17.35% done, estimate finish Tue May 11 20:11:32 2004 17.54% done, estimate finish Tue May 11 20:11:31 2004 17.73% done, estimate finish Tue May 11 20:11:30 2004 17.92% done, estimate finish Tue May 11 20:11:29 2004 18.10% done, estimate finish Tue May 11 20:11:29 2004 18.29% done, estimate finish Tue May 11 20:11:28 2004 18.48% done, estimate finish Tue May 11 20:11:27 2004 18.66% done, estimate finish Tue May 11 20:11:27 2004 18.85% done, estimate finish Tue May 11 20:11:31 2004 19.03% done, estimate finish Tue May 11 20:11:31 2004 19.22% done, estimate finish Tue May 11 20:11:30 2004 19.41% done, estimate finish Tue May 11 20:11:29 2004 19.59% done, estimate finish Tue May 11 20:11:29 2004 19.78% done, estimate finish Tue May 11 20:11:28 2004 19.97% done, estimate finish Tue May 11 20:11:28 2004 20.15% done, estimate finish Tue May 11 20:11:27 2004 20.34% done, estimate finish Tue May 11 20:11:26 2004 20.52% done, estimate finish Tue May 11 20:11:31 2004 20.72% done, estimate finish Tue May 11 20:11:30 2004 20.90% done, estimate finish Tue May 11 20:11:29 2004 21.09% done, estimate finish Tue May 11 20:11:34 2004 21.27% done, estimate finish Tue May 11 20:11:33 2004 21.46% done, estimate finish Tue May 11 20:11:32 2004 21.64% done, estimate finish Tue May 11 20:11:32 2004 21.83% done, estimate finish Tue May 11 20:11:36 2004 22.02% done, estimate finish Tue May 11 20:11:35 2004 22.21% done, estimate finish Tue May 11 20:11:35 2004 22.39% done, estimate finish Tue May 11 20:11:34 2004 22.58% done, estimate finish Tue May 11 20:11:33 2004 22.77% done, estimate finish Tue May 11 20:11:33 2004 22.95% done, estimate finish Tue May 11 20:11:32 2004 23.14% done, estimate finish Tue May 11 20:11:32 2004 23.32% done, estimate finish Tue May 11 20:11:31 2004 23.51% done, estimate finish Tue May 11 20:11:35 2004 23.70% done, estimate finish Tue May 11 20:11:34 2004 23.88% done, estimate finish Tue May 11 20:11:34 2004 24.07% done, estimate finish Tue May 11 20:11:33 2004 24.26% done, estimate finish Tue May 11 20:11:33 2004 24.45% done, estimate finish Tue May 11 20:11:32 2004 24.63% done, estimate finish Tue May 11 20:11:32 2004 24.82% done, estimate finish Tue May 11 20:11:31 2004 25.01% done, estimate finish Tue May 11 20:11:30 2004 25.19% done, estimate finish Tue May 11 20:11:30 2004 25.38% done, estimate finish Tue May 11 20:11:29 2004 25.56% done, estimate finish Tue May 11 20:11:33 2004 25.75% done, estimate finish Tue May 11 20:11:32 2004 25.94% done, estimate finish Tue May 11 20:11:32 2004 26.12% done, estimate finish Tue May 11 20:11:31 2004 26.31% done, estimate finish Tue May 11 20:11:31 2004 26.50% done, estimate finish Tue May 11 20:11:30 2004 26.68% done, estimate finish Tue May 11 20:11:30 2004 26.87% done, estimate finish Tue May 11 20:11:29 2004 27.05% done, estimate finish Tue May 11 20:11:29 2004 27.25% done, estimate finish Tue May 11 20:11:32 2004 27.43% done, estimate finish Tue May 11 20:11:32 2004 27.62% done, estimate finish Tue May 11 20:11:31 2004 27.80% done, estimate finish Tue May 11 20:11:31 2004 27.99% done, estimate finish Tue May 11 20:11:34 2004 28.18% done, estimate finish Tue May 11 20:11:33 2004 28.36% done, estimate finish Tue May 11 20:11:33 2004 28.55% done, estimate finish Tue May 11 20:11:33 2004 28.74% done, estimate finish Tue May 11 20:11:32 2004 28.92% done, estimate finish Tue May 11 20:11:32 2004 29.11% done, estimate finish Tue May 11 20:11:35 2004 29.29% done, estimate finish Tue May 11 20:11:34 2004 29.48% done, estimate finish Tue May 11 20:11:34 2004 29.67% done, estimate finish Tue May 11 20:11:33 2004 29.85% done, estimate finish Tue May 11 20:11:33 2004 30.04% done, estimate finish Tue May 11 20:11:32 2004 30.23% done, estimate finish Tue May 11 20:11:32 2004 30.42% done, estimate finish Tue May 11 20:11:32 2004 30.60% done, estimate finish Tue May 11 20:11:31 2004 30.79% done, estimate finish Tue May 11 20:11:31 2004 30.98% done, estimate finish Tue May 11 20:11:34 2004 31.16% done, estimate finish Tue May 11 20:11:33 2004 31.35% done, estimate finish Tue May 11 20:11:33 2004 31.53% done, estimate finish Tue May 11 20:11:32 2004 31.72% done, estimate finish Tue May 11 20:11:32 2004 31.91% done, estimate finish Tue May 11 20:11:31 2004 32.09% done, estimate finish Tue May 11 20:11:31 2004 32.28% done, estimate finish Tue May 11 20:11:31 2004 32.47% done, estimate finish Tue May 11 20:11:30 2004 32.65% done, estimate finish Tue May 11 20:11:30 2004 32.84% done, estimate finish Tue May 11 20:11:33 2004 33.02% done, estimate finish Tue May 11 20:11:32 2004 33.22% done, estimate finish Tue May 11 20:11:32 2004 33.40% done, estimate finish Tue May 11 20:11:31 2004 33.59% done, estimate finish Tue May 11 20:11:31 2004 33.77% done, estimate finish Tue May 11 20:11:31 2004 33.96% done, estimate finish Tue May 11 20:11:30 2004 34.15% done, estimate finish Tue May 11 20:11:30 2004 34.33% done, estimate finish Tue May 11 20:11:32 2004 34.52% done, estimate finish Tue May 11 20:11:32 2004 34.71% done, estimate finish Tue May 11 20:11:32 2004 34.89% done, estimate finish Tue May 11 20:11:31 2004 35.08% done, estimate finish Tue May 11 20:11:34 2004 35.27% done, estimate finish Tue May 11 20:11:33 2004 35.45% done, estimate finish Tue May 11 20:11:33 2004 35.64% done, estimate finish Tue May 11 20:11:33 2004 35.83% done, estimate finish Tue May 11 20:11:32 2004 36.01% done, estimate finish Tue May 11 20:11:32 2004 36.20% done, estimate finish Tue May 11 20:11:32 2004 36.38% done, estimate finish Tue May 11 20:11:34 2004 36.57% done, estimate finish Tue May 11 20:11:34 2004 36.76% done, estimate finish Tue May 11 20:11:33 2004 36.94% done, estimate finish Tue May 11 20:11:33 2004 37.13% done, estimate finish Tue May 11 20:11:33 2004 37.32% done, estimate finish Tue May 11 20:11:32 2004 37.50% done, estimate finish Tue May 11 20:11:32 2004 37.69% done, estimate finish Tue May 11 20:11:31 2004 37.88% done, estimate finish Tue May 11 20:11:31 2004 38.06% done, estimate finish Tue May 11 20:11:33 2004 38.25% done, estimate finish Tue May 11 20:11:33 2004 38.43% done, estimate finish Tue May 11 20:11:33 2004 38.63% done, estimate finish Tue May 11 20:11:32 2004 38.81% done, estimate finish Tue May 11 20:11:32 2004 39.00% done, estimate finish Tue May 11 20:11:32 2004 39.18% done, estimate finish Tue May 11 20:11:31 2004 39.37% done, estimate finish Tue May 11 20:11:31 2004 39.56% done, estimate finish Tue May 11 20:11:31 2004 39.74% done, estimate finish Tue May 11 20:11:33 2004 39.93% done, estimate finish Tue May 11 20:11:33 2004 40.12% done, estimate finish Tue May 11 20:11:32 2004 40.30% done, estimate finish Tue May 11 20:11:32 2004 40.49% done, estimate finish Tue May 11 20:11:32 2004 40.68% done, estimate finish Tue May 11 20:11:31 2004 40.86% done, estimate finish Tue May 11 20:11:31 2004 41.05% done, estimate finish Tue May 11 20:11:31 2004 41.23% done, estimate finish Tue May 11 20:11:30 2004 41.42% done, estimate finish Tue May 11 20:11:33 2004 41.61% done, estimate finish Tue May 11 20:11:32 2004 41.79% done, estimate finish Tue May 11 20:11:32 2004 41.98% done, estimate finish Tue May 11 20:11:34 2004 42.17% done, estimate finish Tue May 11 20:11:34 2004 42.36% done, estimate finish Tue May 11 20:11:33 2004 42.54% done, estimate finish Tue May 11 20:11:33 2004 42.73% done, estimate finish Tue May 11 20:11:33 2004 42.91% done, estimate finish Tue May 11 20:11:32 2004 43.11% done, estimate finish Tue May 11 20:11:32 2004 43.29% done, estimate finish Tue May 11 20:11:34 2004 43.47% done, estimate finish Tue May 11 20:11:34 2004 43.66% done, estimate finish Tue May 11 20:11:33 2004 43.85% done, estimate finish Tue May 11 20:11:33 2004 44.03% done, estimate finish Tue May 11 20:11:33 2004 44.22% done, estimate finish Tue May 11 20:11:33 2004 44.41% done, estimate finish Tue May 11 20:11:32 2004 44.60% done, estimate finish Tue May 11 20:11:32 2004 44.78% done, estimate finish Tue May 11 20:11:32 2004 44.97% done, estimate finish Tue May 11 20:11:31 2004 45.16% done, estimate finish Tue May 11 20:11:33 2004 45.34% done, estimate finish Tue May 11 20:11:33 2004 45.53% done, estimate finish Tue May 11 20:11:33 2004 45.71% done, estimate finish Tue May 11 20:11:33 2004 45.90% done, estimate finish Tue May 11 20:11:32 2004 46.09% done, estimate finish Tue May 11 20:11:32 2004 46.28% done, estimate finish Tue May 11 20:11:32 2004 46.46% done, estimate finish Tue May 11 20:11:31 2004 46.65% done, estimate finish Tue May 11 20:11:33 2004 46.83% done, estimate finish Tue May 11 20:11:33 2004 47.02% done, estimate finish Tue May 11 20:11:33 2004 47.21% done, estimate finish Tue May 11 20:11:32 2004 47.39% done, estimate finish Tue May 11 20:11:32 2004 47.58% done, estimate finish Tue May 11 20:11:32 2004 47.77% done, estimate finish Tue May 11 20:11:32 2004 47.96% done, estimate finish Tue May 11 20:11:31 2004 48.14% done, estimate finish Tue May 11 20:11:31 2004 48.33% done, estimate finish Tue May 11 20:11:33 2004 48.51% done, estimate finish Tue May 11 20:11:33 2004 48.70% done, estimate finish Tue May 11 20:11:32 2004 48.88% done, estimate finish Tue May 11 20:11:32 2004 49.07% done, estimate finish Tue May 11 20:11:34 2004 49.26% done, estimate finish Tue May 11 20:11:34 2004 49.45% done, estimate finish Tue May 11 20:11:33 2004 49.63% done, estimate finish Tue May 11 20:11:33 2004 49.82% done, estimate finish Tue May 11 20:11:35 2004 50.01% done, estimate finish Tue May 11 20:11:34 2004 50.19% done, estimate finish Tue May 11 20:11:34 2004 50.38% done, estimate finish Tue May 11 20:11:34 2004 50.56% done, estimate finish Tue May 11 20:11:34 2004 50.75% done, estimate finish Tue May 11 20:11:33 2004 50.94% done, estimate finish Tue May 11 20:11:33 2004 51.12% done, estimate finish Tue May 11 20:11:33 2004 51.31% done, estimate finish Tue May 11 20:11:33 2004 51.50% done, estimate finish Tue May 11 20:11:32 2004 51.69% done, estimate finish Tue May 11 20:11:32 2004 51.87% done, estimate finish Tue May 11 20:11:34 2004 52.06% done, estimate finish Tue May 11 20:11:34 2004 52.25% done, estimate finish Tue May 11 20:11:33 2004 52.43% done, estimate finish Tue May 11 20:11:33 2004 52.62% done, estimate finish Tue May 11 20:11:33 2004 52.81% done, estimate finish Tue May 11 20:11:33 2004 52.99% done, estimate finish Tue May 11 20:11:32 2004 53.18% done, estimate finish Tue May 11 20:11:32 2004 53.36% done, estimate finish Tue May 11 20:11:32 2004 53.55% done, estimate finish Tue May 11 20:11:32 2004 53.74% done, estimate finish Tue May 11 20:11:31 2004 53.92% done, estimate finish Tue May 11 20:11:33 2004 54.11% done, estimate finish Tue May 11 20:11:33 2004 54.30% done, estimate finish Tue May 11 20:11:32 2004 54.48% done, estimate finish Tue May 11 20:11:32 2004 54.67% done, estimate finish Tue May 11 20:11:32 2004 54.86% done, estimate finish Tue May 11 20:11:32 2004 55.04% done, estimate finish Tue May 11 20:11:32 2004 55.23% done, estimate finish Tue May 11 20:11:31 2004 55.41% done, estimate finish Tue May 11 20:11:31 2004 55.60% done, estimate finish Tue May 11 20:11:31 2004 55.79% done, estimate finish Tue May 11 20:11:32 2004 55.97% done, estimate finish Tue May 11 20:11:32 2004 56.16% done, estimate finish Tue May 11 20:11:32 2004 56.35% done, estimate finish Tue May 11 20:11:32 2004 56.53% done, estimate finish Tue May 11 20:11:31 2004 56.72% done, estimate finish Tue May 11 20:11:33 2004 56.91% done, estimate finish Tue May 11 20:11:33 2004 57.10% done, estimate finish Tue May 11 20:11:33 2004 57.28% done, estimate finish Tue May 11 20:11:34 2004 57.47% done, estimate finish Tue May 11 20:11:34 2004 57.66% done, estimate finish Tue May 11 20:11:34 2004 57.84% done, estimate finish Tue May 11 20:11:33 2004 58.03% done, estimate finish Tue May 11 20:11:33 2004 58.22% done, estimate finish Tue May 11 20:11:33 2004 58.40% done, estimate finish Tue May 11 20:11:33 2004 58.59% done, estimate finish Tue May 11 20:11:34 2004 58.77% done, estimate finish Tue May 11 20:11:34 2004 58.96% done, estimate finish Tue May 11 20:11:34 2004 59.15% done, estimate finish Tue May 11 20:11:34 2004 59.33% done, estimate finish Tue May 11 20:11:33 2004 59.52% done, estimate finish Tue May 11 20:11:35 2004 59.71% done, estimate finish Tue May 11 20:11:35 2004 59.89% done, estimate finish Tue May 11 20:11:34 2004 60.08% done, estimate finish Tue May 11 20:11:34 2004 60.27% done, estimate finish Tue May 11 20:11:34 2004 60.45% done, estimate finish Tue May 11 20:11:35 2004 60.64% done, estimate finish Tue May 11 20:11:35 2004 60.83% done, estimate finish Tue May 11 20:11:36 2004 61.01% done, estimate finish Tue May 11 20:11:36 2004 61.20% done, estimate finish Tue May 11 20:11:36 2004 61.39% done, estimate finish Tue May 11 20:11:36 2004 61.57% done, estimate finish Tue May 11 20:11:37 2004 61.76% done, estimate finish Tue May 11 20:11:37 2004 61.94% done, estimate finish Tue May 11 20:11:37 2004 62.13% done, estimate finish Tue May 11 20:11:37 2004 62.32% done, estimate finish Tue May 11 20:11:36 2004 62.51% done, estimate finish Tue May 11 20:11:38 2004 62.69% done, estimate finish Tue May 11 20:11:37 2004 62.88% done, estimate finish Tue May 11 20:11:37 2004 63.07% done, estimate finish Tue May 11 20:11:37 2004 63.25% done, estimate finish Tue May 11 20:11:37 2004 63.44% done, estimate finish Tue May 11 20:11:37 2004 63.63% done, estimate finish Tue May 11 20:11:36 2004 63.81% done, estimate finish Tue May 11 20:11:36 2004 64.00% done, estimate finish Tue May 11 20:11:38 2004 64.19% done, estimate finish Tue May 11 20:11:37 2004 64.37% done, estimate finish Tue May 11 20:11:37 2004 64.56% done, estimate finish Tue May 11 20:11:37 2004 64.75% done, estimate finish Tue May 11 20:11:37 2004 64.93% done, estimate finish Tue May 11 20:11:36 2004 65.12% done, estimate finish Tue May 11 20:11:36 2004 65.31% done, estimate finish Tue May 11 20:11:36 2004 65.49% done, estimate finish Tue May 11 20:11:36 2004 65.68% done, estimate finish Tue May 11 20:11:37 2004 65.87% done, estimate finish Tue May 11 20:11:37 2004 66.05% done, estimate finish Tue May 11 20:11:37 2004 66.24% done, estimate finish Tue May 11 20:11:38 2004 66.42% done, estimate finish Tue May 11 20:11:38 2004 66.61% done, estimate finish Tue May 11 20:11:38 2004 66.80% done, estimate finish Tue May 11 20:11:37 2004 66.99% done, estimate finish Tue May 11 20:11:37 2004 67.17% done, estimate finish Tue May 11 20:11:37 2004 67.35% done, estimate finish Tue May 11 20:11:38 2004 67.55% done, estimate finish Tue May 11 20:11:38 2004 67.73% done, estimate finish Tue May 11 20:11:38 2004 67.92% done, estimate finish Tue May 11 20:11:38 2004 68.10% done, estimate finish Tue May 11 20:11:37 2004 68.29% done, estimate finish Tue May 11 20:11:37 2004 68.48% done, estimate finish Tue May 11 20:11:37 2004 68.66% done, estimate finish Tue May 11 20:11:37 2004 68.85% done, estimate finish Tue May 11 20:11:37 2004 69.04% done, estimate finish Tue May 11 20:11:36 2004 69.22% done, estimate finish Tue May 11 20:11:38 2004 69.41% done, estimate finish Tue May 11 20:11:37 2004 69.60% done, estimate finish Tue May 11 20:11:37 2004 69.78% done, estimate finish Tue May 11 20:11:37 2004 69.97% done, estimate finish Tue May 11 20:11:37 2004 70.15% done, estimate finish Tue May 11 20:11:37 2004 70.34% done, estimate finish Tue May 11 20:11:36 2004 70.53% done, estimate finish Tue May 11 20:11:36 2004 70.72% done, estimate finish Tue May 11 20:11:37 2004 70.90% done, estimate finish Tue May 11 20:11:37 2004 71.09% done, estimate finish Tue May 11 20:11:37 2004 71.28% done, estimate finish Tue May 11 20:11:37 2004 71.46% done, estimate finish Tue May 11 20:11:37 2004 71.65% done, estimate finish Tue May 11 20:11:36 2004 71.83% done, estimate finish Tue May 11 20:11:36 2004 72.02% done, estimate finish Tue May 11 20:11:36 2004 72.21% done, estimate finish Tue May 11 20:11:37 2004 72.39% done, estimate finish Tue May 11 20:11:37 2004 72.58% done, estimate finish Tue May 11 20:11:37 2004 72.77% done, estimate finish Tue May 11 20:11:38 2004 72.95% done, estimate finish Tue May 11 20:11:38 2004 73.14% done, estimate finish Tue May 11 20:11:38 2004 73.33% done, estimate finish Tue May 11 20:11:39 2004 73.51% done, estimate finish Tue May 11 20:11:39 2004 73.70% done, estimate finish Tue May 11 20:11:38 2004 73.88% done, estimate finish Tue May 11 20:11:38 2004 74.07% done, estimate finish Tue May 11 20:11:38 2004 74.26% done, estimate finish Tue May 11 20:11:38 2004 74.44% done, estimate finish Tue May 11 20:11:38 2004 74.63% done, estimate finish Tue May 11 20:11:39 2004 74.82% done, estimate finish Tue May 11 20:11:39 2004 75.00% done, estimate finish Tue May 11 20:11:38 2004 75.19% done, estimate finish Tue May 11 20:11:38 2004 75.38% done, estimate finish Tue May 11 20:11:38 2004 75.56% done, estimate finish Tue May 11 20:11:38 2004 75.75% done, estimate finish Tue May 11 20:11:39 2004 75.94% done, estimate finish Tue May 11 20:11:39 2004 76.12% done, estimate finish Tue May 11 20:11:39 2004 76.31% done, estimate finish Tue May 11 20:11:39 2004 76.50% done, estimate finish Tue May 11 20:11:38 2004 76.68% done, estimate finish Tue May 11 20:11:38 2004 76.87% done, estimate finish Tue May 11 20:11:38 2004 77.06% done, estimate finish Tue May 11 20:11:39 2004 77.25% done, estimate finish Tue May 11 20:11:39 2004 77.43% done, estimate finish Tue May 11 20:11:39 2004 77.62% done, estimate finish Tue May 11 20:11:39 2004 77.81% done, estimate finish Tue May 11 20:11:40 2004 77.99% done, estimate finish Tue May 11 20:11:39 2004 78.18% done, estimate finish Tue May 11 20:11:39 2004 78.36% done, estimate finish Tue May 11 20:11:39 2004 78.55% done, estimate finish Tue May 11 20:11:39 2004 78.74% done, estimate finish Tue May 11 20:11:39 2004 78.92% done, estimate finish Tue May 11 20:11:39 2004 79.11% done, estimate finish Tue May 11 20:11:38 2004 79.30% done, estimate finish Tue May 11 20:11:38 2004 79.49% done, estimate finish Tue May 11 20:11:39 2004 79.67% done, estimate finish Tue May 11 20:11:39 2004 79.86% done, estimate finish Tue May 11 20:11:39 2004 80.05% done, estimate finish Tue May 11 20:11:39 2004 80.23% done, estimate finish Tue May 11 20:11:39 2004 80.42% done, estimate finish Tue May 11 20:11:38 2004 80.60% done, estimate finish Tue May 11 20:11:38 2004 80.79% done, estimate finish Tue May 11 20:11:38 2004 80.98% done, estimate finish Tue May 11 20:11:38 2004 81.16% done, estimate finish Tue May 11 20:11:39 2004 81.35% done, estimate finish Tue May 11 20:11:39 2004 81.53% done, estimate finish Tue May 11 20:11:39 2004 81.72% done, estimate finish Tue May 11 20:11:38 2004 81.91% done, estimate finish Tue May 11 20:11:38 2004 82.09% done, estimate finish Tue May 11 20:11:38 2004 82.28% done, estimate finish Tue May 11 20:11:38 2004 82.47% done, estimate finish Tue May 11 20:11:39 2004 82.65% done, estimate finish Tue May 11 20:11:39 2004 82.84% done, estimate finish Tue May 11 20:11:39 2004 83.03% done, estimate finish Tue May 11 20:11:38 2004 83.21% done, estimate finish Tue May 11 20:11:38 2004 83.40% done, estimate finish Tue May 11 20:11:38 2004 83.59% done, estimate finish Tue May 11 20:11:38 2004 83.77% done, estimate finish Tue May 11 20:11:38 2004 83.96% done, estimate finish Tue May 11 20:11:39 2004 84.15% done, estimate finish Tue May 11 20:11:40 2004 84.33% done, estimate finish Tue May 11 20:11:40 2004 84.52% done, estimate finish Tue May 11 20:11:41 2004 84.71% done, estimate finish Tue May 11 20:11:40 2004 84.90% done, estimate finish Tue May 11 20:11:40 2004 85.08% done, estimate finish Tue May 11 20:11:40 2004 85.27% done, estimate finish Tue May 11 20:11:40 2004 85.45% done, estimate finish Tue May 11 20:11:40 2004 85.64% done, estimate finish Tue May 11 20:11:41 2004 85.83% done, estimate finish Tue May 11 20:11:41 2004 86.01% done, estimate finish Tue May 11 20:11:40 2004 86.20% done, estimate finish Tue May 11 20:11:40 2004 86.39% done, estimate finish Tue May 11 20:11:41 2004 86.57% done, estimate finish Tue May 11 20:11:41 2004 86.76% done, estimate finish Tue May 11 20:11:41 2004 86.95% done, estimate finish Tue May 11 20:11:41 2004 87.14% done, estimate finish Tue May 11 20:11:41 2004 87.32% done, estimate finish Tue May 11 20:11:40 2004 87.51% done, estimate finish Tue May 11 20:11:41 2004 87.69% done, estimate finish Tue May 11 20:11:41 2004 87.88% done, estimate finish Tue May 11 20:11:42 2004 88.07% done, estimate finish Tue May 11 20:11:42 2004 88.25% done, estimate finish Tue May 11 20:11:42 2004 88.44% done, estimate finish Tue May 11 20:11:42 2004 88.62% done, estimate finish Tue May 11 20:11:43 2004 88.81% done, estimate finish Tue May 11 20:11:42 2004 89.00% done, estimate finish Tue May 11 20:11:42 2004 89.19% done, estimate finish Tue May 11 20:11:42 2004 89.37% done, estimate finish Tue May 11 20:11:43 2004 89.56% done, estimate finish Tue May 11 20:11:43 2004 89.75% done, estimate finish Tue May 11 20:11:43 2004 89.93% done, estimate finish Tue May 11 20:11:43 2004 90.12% done, estimate finish Tue May 11 20:11:42 2004 90.30% done, estimate finish Tue May 11 20:11:42 2004 90.49% done, estimate finish Tue May 11 20:11:42 2004 90.68% done, estimate finish Tue May 11 20:11:42 2004 90.87% done, estimate finish Tue May 11 20:11:42 2004 91.05% done, estimate finish Tue May 11 20:11:42 2004 91.24% done, estimate finish Tue May 11 20:11:43 2004 91.43% done, estimate finish Tue May 11 20:11:42 2004 91.61% done, estimate finish Tue May 11 20:11:42 2004 91.80% done, estimate finish Tue May 11 20:11:42 2004 91.98% done, estimate finish Tue May 11 20:11:42 2004 92.17% done, estimate finish Tue May 11 20:11:42 2004 92.36% done, estimate finish Tue May 11 20:11:42 2004 92.54% done, estimate finish Tue May 11 20:11:41 2004 92.73% done, estimate finish Tue May 11 20:11:41 2004 92.92% done, estimate finish Tue May 11 20:11:41 2004 93.10% done, estimate finish Tue May 11 20:11:42 2004 93.29% done, estimate finish Tue May 11 20:11:42 2004 93.48% done, estimate finish Tue May 11 20:11:42 2004 93.67% done, estimate finish Tue May 11 20:11:42 2004 93.85% done, estimate finish Tue May 11 20:11:42 2004 94.04% done, estimate finish Tue May 11 20:11:42 2004 94.23% done, estimate finish Tue May 11 20:11:42 2004 94.41% done, estimate finish Tue May 11 20:11:42 2004 94.60% done, estimate finish Tue May 11 20:11:42 2004 94.78% done, estimate finish Tue May 11 20:11:42 2004 94.97% done, estimate finish Tue May 11 20:11:43 2004 95.16% done, estimate finish Tue May 11 20:11:42 2004 95.34% done, estimate finish Tue May 11 20:11:42 2004 95.53% done, estimate finish Tue May 11 20:11:42 2004 95.72% done, estimate finish Tue May 11 20:11:42 2004 95.90% done, estimate finish Tue May 11 20:11:42 2004 96.09% done, estimate finish Tue May 11 20:11:42 2004 96.28% done, estimate finish Tue May 11 20:11:41 2004 96.46% done, estimate finish Tue May 11 20:11:41 2004 96.65% done, estimate finish Tue May 11 20:11:41 2004 96.83% done, estimate finish Tue May 11 20:11:41 2004 97.02% done, estimate finish Tue May 11 20:11:41 2004 97.21% done, estimate finish Tue May 11 20:11:42 2004 97.40% done, estimate finish Tue May 11 20:11:42 2004 97.58% done, estimate finish Tue May 11 20:11:41 2004 97.77% done, estimate finish Tue May 11 20:11:41 2004 97.96% done, estimate finish Tue May 11 20:11:41 2004 98.14% done, estimate finish Tue May 11 20:11:41 2004 98.33% done, estimate finish Tue May 11 20:11:41 2004 98.51% done, estimate finish Tue May 11 20:11:41 2004 98.70% done, estimate finish Tue May 11 20:11:41 2004 98.89% done, estimate finish Tue May 11 20:11:41 2004 99.08% done, estimate finish Tue May 11 20:11:41 2004 99.26% done, estimate finish Tue May 11 20:11:41 2004 99.45% done, estimate finish Tue May 11 20:11:41 2004 99.64% done, estimate finish Tue May 11 20:11:41 2004 99.82% done, estimate finish Tue May 11 20:11:41 2004 Total translation table size: 0 Total rockridge attributes bytes: 1526405 Total directory bytes: 3442688 Path table size(bytes): 11148 Max brk space used c71000 267985 extents written (523 Mb) mkisofs comand: ----------------------- /usr/bin/mkisofs -gui -graft-points -V CDROM -volset -A K3B THE CD KREATOR VERSION 0.9 (C) 2003 SEBASTIAN TRUEG AND THE K3B TEAM -P -p K3b - Version 0.9 -sysid LINUX -volset-size 1 -volset-seqno 1 -r -hide-list /tmp/kde-jmj/k3bScCric.tmp -J -hide-joliet-list /tmp/kde-jmj/k3bjOe3Mb.tmp -U -iso-level 2 -path-list /tmp/kde-jmj/k3bmqXcwb.tmp
*** This bug has been marked as a duplicate of 75023 ***