SUMMARY When adding a new operation based on a previous one having a check number, the new check number is not automatically incremented but simply copied. STEPS TO REPRODUCE 1. Create a new operation based on an old one having a check number 2. Look at the check number for the new operation OBSERVED RESULT The check number is copied from the old operation. EXPECTED RESULT The check number should be incremented. SOFTWARE/OS VERSIONS Operating System: Debian GNU/Linux 13 KDE Plasma Version: 6.5.3 KDE Frameworks Version: 6.20.0 Qt Version: 6.9.2 Kernel Version: 6.17.8+deb14-amd64 (64-bit) Graphics Platform: X11 Processors: 4 × Intel® Core™ i7-7567U CPU @ 3.50GHz Memory: 32 Gio of RAM (31.2 Gio usable) Graphics Processor: Intel® Iris® Plus Graphics 650
This has recently been fixed.