SUMMARY Just like the title says, events which are dragged and then dropped to a different day (dropping them to the same day makes Kalendar crashed, as reported in bug 465080) become invisible, though they can still be interacted with. STEPS TO REPRODUCE 1. Drag and drop an event to a different day. OBSERVED RESULT The event becomes invisible. EXPECTED RESULT The event stays visible. SOFTWARE/OS VERSIONS Linux: KDE neon KDE Plasma Version: 5.26.5 KDE Frameworks Version: 5.102.0 Qt Version: 5.15.8 ADDITIONAL INFORMATION
This appears to be fixed in Merkuro 23.08.4. Thanks. I'll close this report.