Version: SVN trunk (using KDE 4.7.3) OS: Linux Changing the remaining number of transactions on a scheduled transaction with a weekend option set can show an incorrect scheduled date Reproducible: Always Steps to Reproduce: Set up a repeating scheduled transaction for every 6 days for 20 transactions with a weekend option of next processing day. Edit transaction and change the number of transactions left Look at the date Actual Results: Date shows as falling on a non-processing day Expected Results: Date is adjusted so shows as falling on a processing day.
This can no longer be reproduced so I guess it was fixed by later development of the processing days feature.