Version: unspecified (using Devel) OS: Linux version 20101122.1199717-1maemo1.1199691 After completion of a task with recurrence in the tasks list it is on 100% in the list but 0% in the view. Reproducible: Always Steps to Reproduce: 1. Create a task with daily recurrence. 2. Choose the task list of the todo. 3. Set the task to 100% in the list. 4. Select the task. 5. Look back to the list. Actual Results: In the view the task is at 0% and in the list it is 100% So the recurrence handling is not working correctly. Expected Results: In the list should also be 0% in this case.
Hej Ludwig, the bug has been fixed in SVN/trunk now. If you set the status of a daily recurring task to 100% via the slider, the date is changed to the next day and the status is reset to 0%. Ciao, Tobias
Task Touch (Windows CE) 2011-01-16 test of the description:passed Closed