Summary: | KOrganizer monthly view cannot scroll week by week | ||
---|---|---|---|
Product: | [Applications] korganizer | Reporter: | ngia003 |
Component: | monthview | Assignee: | kdepim bugs <kdepim-bugs> |
Status: | CONFIRMED --- | ||
Severity: | wishlist | CC: | beasley, david001, jo4kde, kde-bugs, samuel.a.ward, tprotopopescu |
Priority: | NOR | ||
Version: | unspecified | ||
Target Milestone: | --- | ||
Platform: | unspecified | ||
OS: | Linux | ||
Latest Commit: | Version Fixed In: | ||
Sentry Crash Report: | |||
Attachments: | KOrganizer_View_Conf |
Description
ngia003
2012-08-27 03:41:05 UTC
+1 for this feature. Created attachment 76185 [details]
KOrganizer_View_Conf
By ticking the Scroll By Week, the client could then advance the week in the calender by one week instead of an entire month with the up or down arrows on the side of the month view..
To further explain a Weekly scroll feature as opposed to Scrolling By Month, I've enclosed a mock up of the dialog that would demonstrate the Config Setting. The default could remain as it is in the Monthly view, since it has been the default behavior of Korganizer to this point. Feature allows a better view of events that occur at the end or beginning of each month, or to always display the current week at the top of the calendar to see what events occur in the next 4 weeks in the calendar view. As opposed to switching to the Summary view. This feature would be similar to Muiltweek in Thunderbird's Lightning Extension. I would very much like to have this feature back, it used to be present in 4.7 (I think, before the big kontact revamp a while back), and was very handy; this might mean this should be a bug (since it can be viewed as a regression) rather a wish? Either way, it would be very useful to have this functionality again. Confirmed in Kontact 4.14.10 (as in OpenSUSE Leap 42.1). Note that May and June 2016 fit into 5 weeks and therefore the problem is currently not as bad but during the second half of July, we'll be suffering again. *** This bug has been confirmed by popular vote. *** The bug is still present in Kontact 5.7.3 and has now been present for more than five years now! Is Kontact still actively developed? Kontact is a container. The relevant project is KOrganizer and https://cgit.kde.org/korganizer.git/log/ shows some activity. It seems that the developers rate this feature request just high enough to not close it with "won't fix". I'm sure a patch from the community will be appreciated. It's in the nature of the application that the users who suffer the most from this missing feature do not have the time to implement it. Workaround: Use the agenda view, select 2-3 weeks and drag the separator as far left as possible. Reading my old comment #5 an alternative to implementing smooth scrolling would be to allow the user to change the number of displayed weeks. If 8 weeks were shown I could now see all the way to the 20th of May, instead of just to the 6th of May. |