Bug 85279 - data wizard progress bar never gets above 50%
Summary: data wizard progress bar never gets above 50%
Status: RESOLVED FIXED
Alias: None
Product: kst
Classification: Applications
Component: general (show other bugs)
Version: 1.x
Platform: RedHat Enterprise Linux Linux
: NOR normal
Target Milestone: ---
Assignee: kst
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2004-07-15 20:35 UTC by Matthew Truch
Modified: 2004-08-11 21:02 UTC (History)
0 users

See Also:
Latest Commit:
Version Fixed In:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Matthew Truch 2004-07-15 20:35:55 UTC
Version:           0.99devel (using KDE KDE 3.2.1)
Installed from:    RedHat RPMs
OS:                Linux

The progress bar at the end of the data wizard never shows a value above 50%.  

How to reproduce: open new kst; click on data wizard; load some data; click finish.  The progress bar window will pop up, and the bar will go from 0-50%, and at 50% it will be done.

Expected behavior: The progress bar will use 100% to indicate completion.
Comment 1 George Staikos 2004-07-24 06:29:38 UTC
I believe this was fixed by Andrew already.
Comment 2 Matthew Truch 2004-07-25 00:21:30 UTC
Actually, now the progress dialog only pops up for a slit second (displaying 100% complete, I think), right before displaying the plots.  This is true even if you have kst plot alot of data (so it takes a long time for the plots to display).  
Comment 3 George Staikos 2004-07-25 09:20:42 UTC
I don't see that behaviour, but I'll leave it open for now.
Comment 4 Andrew Walker 2004-07-26 19:55:08 UTC
I agree with Matt on the behaviour. My changes here did not claim to fix the 
described problem, only to make the progress bar (when you can see it) 
smoother by not moving it forward for each data vector within  a data source, 
but only for each data vector that is being plotted.

Comment 5 Andrew Walker 2004-08-11 21:02:06 UTC
Moved the progress indicator to the status bar .