Version: 1.5 (using KDE 3.5.2, compiled sources) Compiler: Target: i586-mandriva-linux-gnu OS: Linux (i686) release 2.6.12-12mdk for example in French I get Calendrier du Sat Apr 1 2006 au Mon Apr 10 2006
However an italian translator has it OK in KOffice 1.4.2 so maybe something is wrong on my system. It'll need to be confirmed by someone else...
Hi anma :) is this report still valid or is it fixed in 1.6?
Still valid with KSpread 2.3.1
Git commit b2b074a3db177461c8fe2657ce088a5b1abeff61 by Inge Wallin. Committed on 29/06/2013 at 06:48. Pushed by ingwa into branch 'master'. Fix bug 126046 - in InsertCalendar, the start and end dates are not translated Thanks Chusslove for the tip. M +3 -1 sheets/plugins/calendar/CalendarTool.cpp http://commits.kde.org/calligra/b2b074a3db177461c8fe2657ce088a5b1abeff61
annma, can you check if it works for you now?
Hey, why wasn't this resolved?
How can I insert a calendar in sheets stable or master? The plugin is enabled in the settings dialog, but I can't find an action in the gui, so I am not able to check, if dates are translated.