I have the month view on and I navigated to March. Today is January 7. I RMB on March 24 and select New Event. It creates a new event on March 7 instead. It should create the event on March 24.
Subject: osnabrueck_branch: kdepim/korganizer CVS commit by kainhofe: Replace the way to determine the start/end dates for new events by a more general BaseView::eventDurationHint(QDateTime &startDt, QDateTime &endDt, bool &allDay), which gets the defaults and can then change them to e.g. the selection in the agenda or in the month view. If that function is not implemented in subclasses of BaseView, the usual defaults (first day selected in date picker, start/end times as specified in the config) are used. Using this function, the rmb menu in the month view now is able to create events on the day where the rmb was really pressed. CCMAIL: 72038-done@bugs.kde.org M +12 -17 calendarview.cpp 1.231.2.2 M +10 -0 koagendaview.cpp 1.127.2.3 M +3 -0 koagendaview.h 1.57.2.1 M +24 -0 komonthview.cpp 1.84.2.2 M +4 -0 komonthview.h 1.40.2.1 M +5 -0 interfaces/korganizer/baseview.h 1.13.2.1